Adopted September 15, 2004 (Click to View Resolution)
I. Executive Summary (en espanol) 1 Goals and Objectives 3 About Our Home 6 Figure 1-1: Capital Area MPO Planning Boundary 6 Figure 1-2: The Capital Area’s Weather 7 Figure 1-3: Wake County Population Growth 7 Figure 1-4: Neusie Picture 8 Figure 1-5: Raleigh-Durham Metro Air Quality Index History 9 Figure 1-6: The Capital Area MPO Population Table 9 Figure 1-7: An Aging Population 10 Figure 1-8: A Diverse Population 10 Figure 1-9: Employment in the Capital Area 10 Figure 1-10: Governor Easley on Transportation 11 Figure 1-11: 2030 Traffic Volumes 12 Socio-Economic Demographic Forecasts 13 Figure 1-12: Socio-Economic & Demographic Forecast Chart 13 Figure 1-13: Wake County Population Forecast 14 Figure 1-14: Modeled Area Population Forecasts 14 Figure 1-15: Wake County Employment Forecast 15 Figure 1-16: Modeled Area Employment Forecasts 15 II. SE Data Maps 16 Figure 2a-1: 2002 Households 16 Figure 2a-2: 2002-2030 Households 17 Figure 2a-3: 2030 Households 18 Figure 2b-1: 2002 Employment 19 Figure 2b-2: 2002-2030 Employment 20 Figure 2b-3: 2030 Employment 21 III. Introduction to the Triangle Regional Model 22 Figure 3-1: Triangle Regional Model Boundary 22 Triangle Regional Model Performance Measures 23 Figure 3-2: CAMPO/DCHC TRM Performance Measures 23 Regional Trends 24 Figure 3-3: 24 Triangle Regional Model Traffic Volumes 25 Figure 3-4: 2002 Triangle Regional Model Traffic Volumes 25 Figure 3-5: 2030 Triangle Regional Model Traffic Volumes 26 IV. Our Plan: The Capital Area Congestion Management System 27 I. Monitoring Congestion 27 II. Identifying Needs 28 III. Identification of Strategies 28 IV. Safety 29 V. Capacity Expansion 30 VI. Transit 31 VII. Bicycle and Pedestrian Support 31 VIII. Increasing Efficiency and Operational Improvements 31 IX. Travel Demand Management 32 Our Plan: Capital Area MPO 2030 LRTP Road Element 33 Figure 4-1: Fiscally Constrained Road Project Map 34 Figure 4-2: 2040 Unfunded Roadway Projects 35 Figure 4-3: Road Project List 36 Our Plan: Regionally Significant Project Introduction 43 Figure 4-4: Regionally Significant Project Map 44 Figure 4-5: Regionally Significant Project List 45 Our Plan: Safety Introduction 46 Figure 4-6: LRTP Project Map with Crash Rates 47 Figure 4-7: LRTP Projects with Safety Concerns 48 Our Plan: Capital Area MPO 2030 LRTP Transit Element 50 Figure 4-8.1: Projected Transit Revenue Graph 51 Figure 4-8.2: Bus-Rail Interface Plan Documentation 52 Figure 4-8.3: Transit Element Map 54 Figure 4-8.4: CAMPO MTIP Transit Projects 55 Our Plan: Capital Area MPO 2030 LRTP Bike Element 58 Figure 4-9: Bike Element Map 59 Figure 4-10: Incidental Bike Accommodation Project List 60 Our Plan: Corridor and Small Area Studies 63 Figure 4-11: Map of Study Areas 64 Our Plan: Freight Issues 65 Our Plan: Intelligent Transportation Systems 66 Figure 4-12: Triangle Region ITS Deployments 67 Figure 4-13: Triangle Region Freeway Management 68 Figure 4-14: 25 Year Freeway Management Systems Costs 69 Public Involvement Process 70 V. Appendix A: Financial Data A-1 Financial Data Introduction A-1 Figure 5-1a: Local Funding Options A-2 Figure 5-1b: Capital Area MPO Cost/Revenue Graphs A-4 Figure 5-2: Cost Estimates A-5 Figure 5-3: Revenue Forecasts A-6 Figure 5-4: Expected Revenue vs. Costs A-7 Appendix B: Environmental Justice Component B-1 Context, Mission, Methodology B-1 Figure 5-5: Percent Low Income by TAZs B-3 Figure 5-6: Percent Hispanic by TAZs B-4 Figure 5-7: Percent African American by TAZs B-5 Figure 5-8: Impacted Population Spreadsheet B-6 Figure 5-9: Historic Properties B-12 Figure 5-10: Natural Heritage Sites and Endangered Species B-13 Figure 5-11: Natural Resource Impact Spreadsheet B-14 Appendix C: Air Quality C-1 Air Quality Conformity Introduction and AQ Standards C-1 Air Quality Conformity Determination Letter (FHWA) C-3 Air Quality Conformity Determination Letter (EPA) C-4 Additional shapefiles have also been included in the “GIS” folder on the CAMPO 2030 LRTP CD. Email
Kenneth.Withrow@ci.raleigh.nc.us to request a copy of the cd or any other customized datasets, maps, or tables. Disclaimer: The shapefiles included on this website are for reference purposes only. CAMPO is not responsible for errors or inaccuracies within the data provided. Alignments and project scopes are continually being refined and revised by CAMPO staff. Revised files can be provided upon request. Click here to download the CAMPO SE Data tables (in excel format) used in the Triangle Regional Model during the Air Quality Conformity Analysis Determination.
Click here to download a shapefile containing the employment and household forecasts. Additional data has been included in the "SE_Data" folder located on the CAMPO 2030 LRTP CD. Email
Kenneth.Withrow@ci.raleigh.nc.us to request a copy of the cd or any other customized datasets, maps, or tables.
Air Quality Conformity Determination June 15, 2005 (Click to View Resolution)
View Entire Report (80 Megabytes)
View Executive Summary (Executive Summary En Espanol)
Roads:
Funded Long Range Projects (11x17, 34x44)
Un-Funded (2040) Long Range Projects (11x17, 34x44)
Regionally Significant Projects (8.5x11)
Safety Concerns (Crash Rates 2001-2004)(8.5x11)
Transit:
Long Range Transit Projects (11x17, 34x44)
Bicycle:
Incidental Bicycle Accommodations (8.5x11)
Click to download zip files containing the shapefiles and layers described below.
Shapefile
Description
Funded LRTP Roadway Projects
Zip file containing a shapefile of funded roadway projects with attributes including completion date, segment ID, and roadway project typed. Also contains layer files meant to be utilized for display purposes
Grade Separations and Interchanges
Zip file containing shapefiles of grade separations and interchanges called for in the LRTP. Also contains layer files meant to be utilized for display purposes