Adopted September 15, 2004 (Click to View Resolution)
Air Quality Conformity Determination June 15, 2005 (Click to View Resolution)
View
Entire Report (80 Megabytes)
View
Executive Summary (Executive Summary En Espanol)

LRTP Graphic

           

 

 

Table of Contents
Maps
GIS
SE Data

I.         

Part I

     
   

Executive Summary (en espanol)

1

 
   

Goals and Objectives

3

 
   

About Our Home

6

 
     

Figure 1-1:  Capital Area MPO Planning Boundary

6

 
     

Figure 1-2:  The Capital Area’s Weather

7

 
     

Figure 1-3:  Wake County Population Growth

7

 
     

Figure 1-4:  Neusie Picture

8

 
     

Figure 1-5:  Raleigh-Durham Metro Air Quality Index History

9

 
     

Figure 1-6:  The Capital Area MPO Population Table

9

 
     

Figure 1-7:  An Aging Population

10

 
     

Figure 1-8:  A Diverse Population

10

 
     

Figure 1-9:  Employment in the Capital Area

10

 
     

Figure 1-10:  Governor Easley on Transportation

11

 
     

Figure 1-11:  2030 Traffic Volumes

12

 
   

Socio-Economic Demographic Forecasts

13

 
     

Figure 1-12:  Socio-Economic & Demographic Forecast Chart

13

 
     

Figure 1-13:  Wake County Population Forecast                   

14

 
     

Figure 1-14:  Modeled Area Population Forecasts                 

14

 
     

Figure 1-15:  Wake County Employment Forecast                 

15

 
     

Figure 1-16:  Modeled Area Employment Forecasts

15

 
         

II.

Part II

     
   

SE Data Maps

16

 
     

Figure 2a-1:  2002 Households

16

 
     

Figure 2a-2:  2002-2030 Households

17

 
     

Figure 2a-3:  2030 Households                                             

18

 
     

Figure 2b-1:  2002 Employment

19

 
     

Figure 2b-2:  2002-2030 Employment                                   

20

 
     

Figure 2b-3:  2030 Employment

21

 
         

III.

Part III

     
   

Introduction to the Triangle Regional Model

22

 
     

Figure 3-1:  Triangle Regional Model Boundary                     

22

 
   

Triangle Regional Model Performance Measures

23

 
     

Figure 3-2:  CAMPO/DCHC TRM Performance Measures  

23

 
   

Regional Trends

24

 
     

Figure 3-3:  US 70 between Garner and Clayton Photo

24

 
   

Triangle Regional Model Traffic Volumes

25

 
     

Figure 3-4:  2002 Triangle Regional Model Traffic Volumes

25

 
     

Figure 3-5:  2030 Triangle Regional Model Traffic Volumes

26

 
         

IV.

Part IV

     
   

Our Plan:  The Capital Area Congestion Management System

27

 
     

I.  Monitoring Congestion

27

 
     

II. Identifying Needs

28

 
     

III. Identification of Strategies

28

 
     

IV. Safety

29

 
     

V.  Capacity Expansion

30

 
     

VI. Transit

31

 
     

VII. Bicycle and Pedestrian Support

31

 
     

VIII. Increasing Efficiency and Operational Improvements

31

 
     

IX. Travel Demand Management

32

 
   

Our Plan:  Capital Area MPO 2030 LRTP Road Element

33

 
     

Figure 4-1:  Fiscally Constrained Road Project Map

34

 
     

Figure 4-2:  2040 Unfunded Roadway Projects

35

 
     

Figure 4-3:  Road Project List                                               

36

 
   

Our Plan:  Regionally Significant Project Introduction        

43

 
     

Figure 4-4:  Regionally Significant Project Map

44

 
     

Figure 4-5:  Regionally Significant Project List                        

45

 
   

Our Plan:  Safety Introduction

46

 
     

Figure 4-6:  LRTP Project Map with Crash Rates

47

 
     

Figure 4-7:  LRTP Projects with Safety Concerns

48

 
   

Our Plan:  Capital Area MPO 2030 LRTP Transit Element                                                                                                 

50

 
     

Figure 4-8.1:  Projected Transit Revenue Graph

51

 
     

Figure 4-8.2:  Bus-Rail Interface Plan Documentation

52

 
     

Figure 4-8.3:  Transit Element Map

54

 
     

Figure 4-8.4:  CAMPO MTIP Transit Projects

55

 
   

Our Plan:  Capital Area MPO 2030 LRTP Bike Element

58

 
     

Figure 4-9:  Bike Element Map

59

 
     

Figure 4-10:  Incidental Bike Accommodation Project List

60

 
   

Our Plan:  Corridor and Small Area Studies

63

 
     

Figure 4-11:  Map of Study Areas

64

 
   

Our Plan:  Freight Issues

65

 
   

Our Plan:  Intelligent Transportation Systems

66

 
     

Figure 4-12:  Triangle Region ITS Deployments

67

 
     

Figure 4-13:  Triangle Region Freeway Management

68

 
     

Figure 4-14:  25 Year Freeway Management Systems Costs

69

 
   

Public Involvement Process                                                   

70

 
         

V. 

Part V

     
   

Appendix A:  Financial Data

A-1

     

Financial Data Introduction

A-1

     

Figure 5-1a:  Local Funding Options

A-2

     

Figure 5-1b: Capital Area MPO Cost/Revenue Graphs          

A-4

     

Figure 5-2:  Cost Estimates

A-5

     

Figure 5-3:  Revenue Forecasts                                             

A-6

     

Figure 5-4:  Expected Revenue vs. Costs

A-7

   

Appendix B:  Environmental Justice Component

B-1

     

Context, Mission, Methodology

B-1

     

Figure 5-5:  Percent Low Income by TAZs

B-3

     

Figure 5-6:  Percent Hispanic by TAZs                                  

B-4

     

Figure 5-7:  Percent African American by TAZs

B-5

     

Figure 5-8:  Impacted Population Spreadsheet

B-6

     

Figure 5-9:  Historic Properties                                              

B-12

     

Figure 5-10:  Natural Heritage Sites and Endangered Species

B-13

     

Figure 5-11:  Natural Resource Impact Spreadsheet

B-14

   

Appendix C:  Air Quality                                                       

C-1

     

Air Quality Conformity Introduction and AQ Standards         

C-1

     

Air Quality Conformity Determination Letter (FHWA)           

C-3

     

Air Quality Conformity Determination Letter (EPA)

C-4

Maps 

Roads: Funded Long Range Projects (11x17, 34x44)
  Un-Funded (2040) Long Range Projects (11x17, 34x44)
  Regionally Significant Projects (8.5x11)
  Safety Concerns (Crash Rates 2001-2004)(8.5x11)
Transit: Long Range Transit Projects (11x17, 34x44)
Bicycle: Incidental Bicycle Accommodations (8.5x11)

GIS       

Click to download zip files containing the shapefiles and layers described below.
Shapefile Description
Funded LRTP Roadway Projects Zip file containing a shapefile of funded roadway projects with attributes including completion date, segment ID, and roadway project typed. Also contains layer files meant to be utilized for display purposes
Grade Separations and Interchanges Zip file containing shapefiles of grade separations and interchanges called for in the LRTP. Also contains layer files meant to be utilized for display purposes

Additional shapefiles have also been included in the “GIS” folder on the CAMPO 2030 LRTP CD.  Email Kenneth.Withrow@ci.raleigh.nc.us to request a copy of the cd or any other customized datasets, maps, or tables. 

Disclaimer: The shapefiles included on this website are for reference purposes only. CAMPO is not responsible for errors or inaccuracies within the data provided. Alignments and project scopes are continually being refined and revised by CAMPO staff. Revised files can be provided upon request.

SE Data

Click here to download the CAMPO SE Data tables (in excel format) used in the Triangle Regional Model during the Air Quality Conformity Analysis Determination. Click here to download a shapefile containing the employment and household forecasts.

Additional data has been included in the "SE_Data" folder located on the CAMPO 2030 LRTP CD. Email Kenneth.Withrow@ci.raleigh.nc.us to request a copy of the cd or any other customized datasets, maps, or tables.