|
TAC Members |
|
Mr. Joe Bryan, TAC Chair Commissioner, Wake County |
|
Mr. Charles Meeker, TAC
Vice Chair Mayor, City of Raleigh |
|
Mr. R. H. Ellington Mayor, Town of Angier |
|
Mr. Keith Weatherly Mayor, Town of Apex |
|
Representative Not Yet
Appointed Town of Bunn |
|
Mr. Ernie McAlister Mayor, Town of Cary |
|
Mr. Robert Ahlert Mayor Pro-Tem, Town of Clayton |
|
Mr. Daryl Moss Mayor, City of Creedmoor |
|
Mr. John Sullivan Federal Highway Administration |
|
Mr. Lynwood Buffaloe Commissioner, Franklin County |
|
Ms. Jenny Edwards Mayor, Town of Franklinton |
|
Mr. John Byrne Mayor, Town of Fuquay-Varina |
|
Mr. Buck Kennedy Alderman, Town of Garner |
|
Mr. Hubert Gooch, Jr. Commissioner, Granville County |
|
Mr. Dan Andrews Commissioner, Harnett County |
|
Mr. Dick Sears Mayor, Town of Holly Springs |
|
Mr. Tony Braswell Commissioner, Johnston County |
|
Mr. Mike Chalk Mayor Pro-Tem, Town of Knightdale |
|
Ms. Jan Faulkner Mayor, Town of Morrisville |
|
Mr. Thomas Betts Member, NC Board of Transportation |
|
Mr. D.M. Campbell Member, NC Board of Transportation |
|
Ms. Nina Szlosberg Member, NC Board of Transportation |
|
Mr. Frank Eagles Mayor Pro-Tem, Town of Rolesville |
|
Ms. Anne Franklin Board Member, Triangle Transit Authority |
|
Ms. Vivian Jones Mayor, Town of Wake Forest |
|
Mr. Bill Connolly Mayor Pro-Tem, Town of Wendell |
|
Ms. Kaye Yadusky Commissioner, Town of Youngsville |
|
Mr. Don Bumgarner Mayor Pro-Tem, Town of Zebulon |
N.C. Capital Area Metropolitan Planning Organization
Transportation
Advisory
Committee
May 16, 2007
4:00 – 6:00 PM
Wake County Commons
4012 Carya Dr
Raleigh, NC
AGENDA HIGHLIGHTS:
·
2030 Long-Range Transportation Plan Amendments
The Capital AreA MPO Vision:
A multi-modal transportation network
that is compatible
with our growth,
sensitive to the environment, improves quality
of
life and is accessible to all (2030 LRTP).
N.C. Capital Area
Metropolitan
Planning Organization
The Capital Area MPO coordinates transportation
planning in Wake County and portions of Franklin, Granville, Johnston, and
Harnett counties. The public is
encouraged to speak at both the Transportation Advisory Committee and the
Technical Coordinating Committee meetings.
There is an opportunity for the public to comment on agenda items at the
beginning of each meeting. When speaking
please tell us your name and place of residence; please limit comments to three
minutes per speaker.
This agenda and the accompanying attachments can be
accessed via the CAMPO website at
In compliance with the
Americans with Disabilities Act (ADA), accommodations will be provided for
persons requiring assistance in order to participate in the N.C. Capital Area MPO’s meetings. If
such assistance is needed or to request this document in an alternative format,
please contact the MPO’s office at 919-807-8511
(voice), 919-807-8517 (fax), or 919-890-3107 (TTY located at City of Raleigh
Public Affairs Dept.) at least 72 hours in advance of the meeting.
|
N.C. CAPITAL AREA |
|
METROPOLITAN PLANNING ORGANIZATION |
|
TRANSPORTATION ADVISORY COMMITTEE |
|
|
|
May 16, 2007 |
|
4:00 pm – 6:00 pm |
|
Wake County Commons |
|
2014 Carya Dr |
|
Raleigh, NC |
|
|
|
AGENDA |
|
|
|
|
|
1. Preliminaries |
2. Adjustments to the Agenda
3. Public Comments
This is an opportunity for comments by those in
attendance on items not on the agenda. Please limit comments to three minutes
for each speaker.
4. Approval of Minutes of the April 18, 2007 TAC
Meeting.
The minutes of the April
18, 2007 TAC meeting, are enclosed as Attachment
4A.
TAC Action: Approval of the minutes of the April 18, 2007
TAC meeting.
5. Memorandum
of Understanding between the NC Turnpike Authority and the Capital Area MPO
At
the September 20, 2006 TAC meeting, development of a Memorandum of
Understanding (MOU) between the NC Turnpike Authority (NCTA) and the Capital Area MPO was
discussed and creation of an MOU was requested.
During the May 11, 2007 special TAC work-session, principles to be
incorporated in the MOU were agreed upon. Attachment
5A is a copy of the principles agreed upon at the May 11, 2007
work-session. Attachment 5B is a copy of the draft MOU incorporating those
principles. The NCTA is meeting on May
15 and 16, 2007, and will consider giving its approval to the MOU and
incorporating these principles. A report
of any action taken at the NCTA meeting will be presented at the May 16, 2007
TAC meeting.
TAC Action: Receive
for review and endorsement the MOU between the NC Turnpike Authority and the
Capital Area MPO relating to turnpike projects to be constructed in the
Triangle Region of North Carolina for action as appropriate.
6. Determination of LRTP and
2007-2013 MTIP Conformity with State Implementation Plan
Prior to adoption of any Long-Range Transportation
Plan (LRTP) or Metropolitan Transportation Improvement Plan (MTIP), or
significant amendments to either that may affect air quality, a transportation
conformity determination is required. Conformity applies to transportation
plans, transportation improvement programs (TIPs),
and projects funded or approved by the Federal Highway Administration (FHWA) or
the Federal Transit Administration (FTA) in areas that do not meet (or
previously have not met) air quality standards for ozone, carbon monoxide,
particulate matter, or nitrogen dioxide.
Attachment 6A is a copy of the Air
Quality Conformity Determination for the 2030 LRTP, based on the proposed
amendments presented in item 7 below, and the 2007-2013 MTIP, presented as item
8 below. The Air Quality Conformity
Determination was advertised for public review and comment and a hearing was
held at the April 18, 2007 TAC meeting.
The public comment period was extended and the hearing was continued
until the May 16, 2007 TAC meeting.
TAC Action: Continue
hearing to receive public comment on the Air Quality Conformity Determination of the
proposed amendments to the 2030 LRTP and the 2007-2013 MTIP to be in Conformity
with the State Implementation
Plan (SIP) and the National Ambient Air Quality Standards (NAAQS).
Upon closing, consider approval of the Air Quality
Conformity Determination for the 2030 Long Range Transportation Plan and
2007-2013 Metropolitan Transportation Improvement Plan.
7.
Capital Area MPO 2030 Long-Range Transportation Plan (LRTP)
Amendments
On September 15, 2004, the
Capital Area MPO adopted the 2030 Long-Range Transportation Plan (LRTP). In September 2006, the TAC approved the Town
of Wendell’s requested amendment to the 2030 Long Range Transportation Plan,
subject to passing an air quality conformity determination. Additionally, the Western Wake Expressway and
a portion of the Triangle Parkway, contained in the 2030 LRTP, have been
designated for construction using toll financing, thus accelerating their
construction schedules. Several other
projects listed in the 2007-2013 STIP have modified project scopes and completion
dates that may not coincide with the adopted 2030 LRTP. It is therefore necessary to amend the 2030
LRTP to reflect these changes. Attachment
7A is a table showing the amendments needed to address these
issues.
These amendments were
advertised for public review and comment for a 30-day period and a hearing was
conducted at the April 18, 2007 TAC meeting.
The public comment period was extended and the hearing continued until
the May 16, 2007 TAC meeting.
TAC Action: Continue hearing to
receive public comments on the proposed 2030 Long-Range Transportation Plan
Amendments. Upon closing consider
approval of the proposed 2030 Long-Range Transportation Plan Amendments.
8.
Capital Area
Metropolitan Transportation Improvement Program (MTIP) for Federal Fiscal Years
2007-2013
On
Thursday, March 1, 2007 the North Carolina Board of Transportation adopted the
2007-2013 State Transportation Improvement Program (STIP). The 2007-2013 Metropolitan Transportation
Improvement Plan (MTIP) must be a subset of the adopted/conforming 2030
Long-Range Transportation Plan in order to be consistent with the STIP during
the first three years, and be compliant with the National Ambient Air Quality
Standards (NAAQS).
After
review of the adopted STIP, the MPO’s position is
that (a) the widening of I-40 (project I-4744) should be accelerated; and, (b)
options for STP-DA funds for 2013 be shown. In the past, NCDOT programmed STP-DA funds
for the Capital Area MPO however; the MPO has expressed a desire to make the
decision on where these funds could best be used. At this time, no information has been
received relative to the 2013 STP-DA funds issue.
A meeting was held on March 29, 2007 between staff
of the Capital Area MPO, NCDOT, FHWA, and the consulting firm of HNTB to
discuss I-40 (project I-4744).
Discussions included the need to accelerate the project, environmental
concerns and funding. It was decided
that, following a six-month traffic analysis, NCDOT would pursue a categorical
exclusion for environmental issues; and, if received, the project could be
accelerated, provided that adequate funding could be identified.
The Capital Area MPO’s Metropolitan
Transportation Improvement Program (MTIP) for FY 2007-2013 and the companion
Air Quality Conformity Determination (AQCD) Report were released for a public
comment period of at least 30 days, and a public hearing was conducted at the
April 18, 2007 TAC meeting. The public comment period was extended and the
hearing continued until the May 16, 2007 TAC meeting. At the time of distribution of this agenda,
no comments had been received. Attachment 8A is a spreadsheet showing the
schedule for I-4744 shown in the adopted 2007-2013 STIP and the accelerated
schedule recommended by the Capital Area MPO.
Attachment 8B is a copy of the
2007-2013 MTIP with the acceleration of I-4744 included. This attachment will be distributed at the
meeting.
TAC Action: Continue hearing to
receive public comment on the Capital Area Metropolitan Transportation Improvement Program
(MTIP) for Federal Fiscal Years 2007-2013. Upon closing, consider approval
of MTIP for Federal Fiscal Years 2007-2013
9. Reports from the TCC Chair
Scott Walston/Rupal Desai –
Transportation Planning Branch
Wally
Bowman/Joey Hopkins - Division 5
12. Other Business and Pending Items
Adjourn
Item #01 – Comprehensive Transportation Plan (Summer/Fall
2007)
Item #02 – Capital Area MPO Organizational
Structure - (Summer/Fall 2007)
Item #03 – Socioeconomic Data
(Summer 2007)
June 7, 2007 - Capital Area MPO TCC Meeting
Room
809 - One Exchange Plaza, Raleigh, NC
10:00
am - Noon
June 20, 2007 - Capital
Area MPO TAC Meeting
Wake
County Commons, 4012 Carya Drive, Raleigh
4:00
pm – 6:00 pm
___________________________