Hot Spots

The Capital Area MPO, in cooperation with staff from member agencies, has developed the region’s Comprehensive Transportation Plan (CTP).  The CTP serves as the unconstrained element of the region’s 2040 Metropolitan Transportation Plan (MTP).  Between 2010 and 2012, the Capital Area MPO conducted a series of sub-regional workshops to identify transportation projects for inclusion in the CTP element of the MTP.  As a result of these workshops, several areas were identified as needing more detailed study to identify feasible and appropriate transportation solutions.  Several of these “hot spot” studies are conducted annually throughout the planning area to identify and develop an analysis of potential operational and safety improvements for approximately two to four locations each year.  Information developed from these studies will be used as a basis for recommendations in the CTP element of the MTP. 

Fiscal Year 2016
NC 55 Bypass Functional Design (from Williams Street/Technology Drive in Apex to South Main Street in Holly Springs)
Final Report   
Appendices 

I-440/Capital Blvd Interchange Analysis
Final Report 

Fiscal Year 2015
Fuquay-Varina US 401 at Sunset Lake/Purfoy Rd Intersection Study
Final Report

I-440/I-40/US 1/US 64 Interchange Study
 Final Report

Fiscal Year 2014
US 1 Corridor Study Mapping Updates
Executive Summary
Technical Memo: Transportation Updates
Online Mapping Site

 US 1 / Falls of Neuse / US 1-A Intersection & Interchange Feasibility Study
Executive Summary
Final Report
Technical Memo 1: Existing Conditions and Trends
Technical Memo 2: Project Feasibility Analysis
Technical Memo 3: Project Impact Analysis
Interim Improvement Recommendations Video Zip - 81.43 MB

US 1 / Ten Ten Road Interchange Feasibility Study
Final Report

Fiscal Year 2013
Granville County I-85 Interchange Feasibility Report
I-85 Interchange Final Report @ 16.68 MB
Tech Memo 1 Existing Conditions 6-28-2013 @ 1.00 MB
Tech Memo 2 Feasibility 6-28-2013 @ 631 KB
Tech Memo 3 Impact 6-28-2013 @ 243 KB

US 401 Final Report
US 401 Hot Spot Final Report @ 7.24 MB
US 401 Hot Spot Final Appendix @ 963 MB

NC 540 Final Report
NC 540 Hot Spot Final Report @ 22.04 MB

Triangle Parkway Extension
Triangle Parkway Hot Spot Final Report @ 9.50 MB

Fiscal Year 2012
Clayton Sam's Branch Greenway O'Neil St Crossing Study
Sam's Branch Multi-Use Path Crossing Transportation Study Final Report 09-02-1 @ 22.53 MB

Wake County Swift Creek Gorman St Extension Analysis
CAMPO Swift CreekStudy Final Report @ 46.41 MB

Fiscal Year 2011
Creedmoor NC56 NC50 US15 Intersection Report
Executive Summary 8-18-11 @ 671 KBCreedmoor Intersections Report Master

Document 8-9-11 @ 32.59 MB

Franklinton Mason Street Rail Crossing Alternatives
Final Franklinton Rail Crossing Report Ver12 (Final) with Appendices @ 2.32 MB

Knightdale Smithfield Road at First Ave Intersection Study
Traffic Appendix @ 9.88 MB
Knightdale FINAL Tech Memo 7-13-11 @ 8.02 MB
Knightdale Final Draft Report Appendices @ 9.90 MB

Wendell Blvd at NC231 Intersection Study
Wendell Blvd Intersection Study Final 7-14-11-REDUCED @ 8.53 MB|
FINAL Wendell Appendices @ 701 KB